Lucainena de las Torres 1
Total output: 7.4256 MWp
Location: Almeria, Spain
Power production: Approx. 11.420.573 kWh/a
CO2 savings: 10.050 t/a (equivalent to 0.88 kg/kWh)
Completion: 2008
Construction time: 6 months
On grid since: 7/31/2008
Lucainena de las Torres 2
Total output: 7.9560 MWp
Location: Almeria, Spain
Power production: Approx. 12.236.328 kWh/a
CO2 savings: 10.768 t/a (equivalent to 0.88 kg/kWh)
Completion: 2008
Construction time: 6 months
On grid since: 7/31/2008
eXenewable database is being updated on an ongoing basis. Help us to improve data accuracy and relevance by contributing additional information about listed projects and companies.
If you are professionally connected to specific projects or companies and you can contribute relevant information updates please contact us